Project Description

Alongside the River Thames and overlooking The Tower of London is “Tower Suites”. 274 luxury apart-hotel suites with long stay tourism in mind.

Fairhills came into this project when it was almost 85% complete, and the End-Client had unfortunately cut ties with the Main Contractor. The main purpose of this project was to assist the Electrical Sub-Contractor inspect and/or remediate the installation, to enable full sign off for opening.

The project saw thousands of non-conformances which had to be removed and re-installed. The entire building then needed Mechanical and Electrical commissioning – with City of London Building Control approval – to get it over the line.

Fairhills helped orchestrate the process, from inspection of the existing new installation, offer advice on changes, and help all the contractors on site be awarded approval from Building Control and London Fire Brigade.

Blue Orchid successfully opened the building in January 2020.